Distributed Slack¶
The existence of the slack bus is a mathematical artifice. It is necessary only because the power flow problem needs to have the same number of unknowns as equations to be solvable, hence the selection of the slack bus in order to achieve this. If no bus is specifically selected GridCal chooses the largest generation bus as the slack.
The problem lies in situations when the calculated slack bus power is far too large, and it distorts the voltage results. Then a solution has been proposed; To share the slack power among the existing generators.
After a first power flow solution, the power is computed and then corrected to be feed into
a second power flow run.
Where:
: Power injections at the buses computed after the power flow.
: Generation installed power per bus.